Bathroom waterproo身市f steps
2017-4-6Browse times:2226
Toilet and drainage tube junction Wate會道r Leakage: the 子友draining pipe is not船道 high enough, the stool 道場outlet pipe insertion depth is n不看ot enough, the co愛刀nnection not filled tightly; t分家he bathroom waterpr數路oof treatment is not good, after using 學愛the toilet, the ground wate離如r, damp walls, even lower roof wall動呢s appear wet and dripping phenomenon.
A toilet after use significant gr是子ound water, should fi師山rst consider the 身船toilet and drainage pipe co對行nnection at the inlet of地暗 the water pit W少年ater Leakage, gently tick to 跳影open the toilet at the inlet of th師書e ground water,動友 check the rubber bowl is intact,視男 if damaged, should be repla志內ced immediately. Such as the origi現土nal use of wire b河美inding, must be repl湖討aced into 14 copper 房化division, the two staggered tied ti購用ght, so that one end and th美子e big head, the other en玩謝d of the connection with the small 筆報head firm. The riser must be in我秒 the lower corner.
Pit wells at the entranc資票e of Water Leakage: construction pit wa高會ter interface was smashed and 見湖did not find, Sheung Shui, rubber bowl金船 lashing is not strong, 理放or with a wire binding, brok綠劇en wire corrosion, a在愛nd the rubber bowl a房能nd the pit at the 購鐵junction of the pit water burst, the u我體se of ground water, damp 男子walls, and cause the lower roof the wa市土lls were also wet and dripping phe讀村nomenon. Collecti煙朋on of water at the ground floor dr裡師ain water effect is not go到可od, often water請器, it will drain 志器the ground around chis厭相eling, re sloping floor drain. The floo放子r drain should tick "eigh見去t" word of mouth, to leak綠訊 the application of soy dry stone con頻鄉crete or cement mortar plug 還黃tightly, and the ground below th遠從e 30cm, and then block polyu熱我rethane waterproo花的f coating or sealing sealing ta唱放pe, top with cement mortar.
The installation of sani朋冷tary ware is not strong, the re鄉章ason is the construction of embedde資到d block are not allowed or not p男資re buried, sanitary inst鐘鄉allation is not strong, the 女日use of sanitary ware loose見河ning instability caused場秒 by pipeline connector damage or 和廠Water Leakage.
Water: the water 也河drain drain port and the ground e藍麗levation or bathroo化樹m elevation to form an inverted pa做內n of water, sanitation and drainage is間飛 not smooth, the weak pa器妹rts of the leaka現到ge or the linoleum 區玩floor sleeve is a rotten li厭音noleum; ground 拿章height is too small, the water direct能影ly from the roof to the lower casing l窗海eakage. Through the floor riser should 關錢be embedded in the casing, and high都那er than the floor o件如f the 20mm, the external use of dry mor很照tar and mortar block hard to理在 wipe the real, the 火和gap between the casing and riser sealed答紅 with waterproof ointment.務朋 The floor needs to cut ho訊現les, tick chisel avai低慢lable hole, no sledgeha愛好mmered hole, the人見 hole is strictly舞生 prohibited to use brick愛國s, crushed concrete, wood, etc. the 拿請block filling ho拿窗le plugging, should adopt C20 pisolite 畫公concrete strictly, surfa筆子ce recessed 10m明美m, two times with waterproof mortar, ro時計ot canal, Yin angle s窗歌hould be put into small the rounded 劇很or eight groove. The e年訊ntrance to the cave, the 友女figure of the slope to d離答o outside the entrance to the 30-50mm.
The local or general roof lea和子kage: because felt well 件鐵after the finished pr學國oduct protection work is not well felt 鐘黑local aging rup但一ture, in addition低計, the leveling la章筆yer cracking, wear floor pipe without c電會asing hole after hole not deal wi制關th debris, concrete brick, wo藍說od, concrete an商有d floor joints p答哥lugging hole crack, cause the waterproo吧子f layer and leveling layer bonded years姐科 in prison, the f金黃ormation of water inlet. Wate區為r enters the structur暗離al layer through defects, so tha農讀t the roof leakage. Do toilet, toilet w來低aterproof layer is the 就劇key to waterproof leakage. T火理he construction of waterp北舊roof layer, leveling layer req北暗uirements neat and clea厭道n, qianggen, root canal to dens議熱e. For the cast in plac道現e floor, in the rammed floor at the sam訊可e time to make the reverse 他快side, against the wall of the roo說吃t surface of the slop章他e as steep as possible, and rounded c靜事orners.
The bathroom baseboard and不知 the ground should be also prec家照ausions, in order to reduce the vertic拍微al mortar joints. Linoleum or rubber w讀機aterproofing to水請 Putie tight, etched surface pa化街ste height to super wat能自er pit, more th少兵an 20cm of the ground station lo姐黃cation squat; mop pool b大計eyond the pool should be 民嗎20cm above the ground匠女, the shower should be下媽 more than 150cm on the ground; the tu相雪b beyond the bathtub 少國along the 40cm s討快ite; the urinal position should be 請藍higher than that of t司得he spray pipe 10-15cm pi拍冷pe; the root of p北子eace, junction should in藍媽crease shop facade glass clot拿數h felt additional 海見layer.
Waterproof height is no男影t enough, so that the ba微動throom wall on the other side of t做鄉he wet spots or traces of trace事雨s, or even the pipeline inte呢月rface to the next l校姐ayer. Procedure to properly process, 鄉弟ride on the street s我們hould be compact and should t空看ry to be felt shop after only v地請ertical frame, to avoid increasing th路城e dead, affect the waterproof effect遠有, press felt layer窗看 and felt protective layer s家冷hould be timely construction, in ord樹見er to reduce the poss章長ible Alice mouth felt.
Linoleum Li Cha Kou Nia一拿njie is not solid, mouths Alice, or 農又because of grassr我來oots local deformation caused by ru街西pture of roofing 影工and facade junction, resulting in風煙 lower and upper wall tube wet 上白stains or weak 外鐘flow marks appear around美跳 the hole.