4

Wall leakage treatment method

2017-4-6Browse times:2335
Wall leakage treatment metho站跳d
Wall is the vertical compo媽慢nent of building physic南聽s, the general situ國筆ation is no water, no water, not e弟和asy to leak. Its 240 thick ou間樂ter wall to 18mm外紙 thick cement mo笑學rtar paint layer c山船an meet the waterproof re子美quirements. However, due to th器近e unreasonable design,爸西 rough construction, improper 哥票material selectio分答n or poor material qualit紅飛y, improper use of the u林又ser or poor management and other facto金分rs will cause the w黃機all cracks caused by leakag坐又e. This article from the classific視也ation and structure of wall wa到年ll leakage; analysis of problems 離水and reasons; exploratio民的n and repair of the leakage不的 of the wall; the 北你analysis of typica金你l examples four aspects湖讀 in detail about the leak repair, i明什n order to achieve the combinatio器黑n of theory and practice guidance for 哥吧practical purposes電票.
Classification and structur答朋e of wall
Wall leakage pheno南站menon, whether i下熱n the whole assembly of large pl窗鐘ate building system, frame light 習市board building system o就人r in the cast in the form of l她購arge formwork system and遠鐘 brick building sy老師stem are not the degree of appea到少rance. All kinds 頻都of wall the force condition林機 and position, different materials used說電, the leakage and repair in dif高可ferent ways, to g計服rasp the common propertie做河s of the wall of the righ劇那t, and to distinguish thei飛暗r respective characteristics, th門市e use of more advanced methods坐道, for governance, strong effecti數睡ve, must be on 老男the object of gover舞見nance, namely category and the 生司wall structure form has a de白明tailed understandi討如ng of.
1 wall according to their locatio老劇n
(1) external wall: th得靜e wall of the building.
(2) the inner wall: the wall of the 公中building.
2 wall according to the算報 state of stress
(1) bearing wall: that is 鐵這to bear the roof,他下 floor and other superstructure of章國 the load and the wei信錯ght of the wall.
(2) non bearing wall: only 林下bear the weight of the wall.
3 wall according to their微討 role
(1) wall: the wa這也ll of the room which is sheltered from電水 the wind and rain and blo就書ck the outside 做亮air temperature 志弟and noise;
(2) partition: partiti從們on of the interior space of the wal亮妹l.
4 wall according to the main mat紅歌erial and structure.
(1): commonly used m費身aterials are ordinary brick brick clay知家 brick, hollow clay brick, slag bric區西k, aerated concrete brick, cement mor業票tar brick, shale brick. Common practi她器ce: solid brick wall, sol務信id brick wall, hollow b哥朋rick wall and composite wall;
(2) cast in place concrete wall panel, 靜腦cast-in-place reinforced concrete能們 wall;
(3) large precas頻西t concrete wall 草務panels;
Based on the domestic use of the larges站廠t and the largest coverage of masonry謝看 materials and construction met水行hods, this paper focuses o開妹n masonry and conc友購rete walls, and other wall.
Two, wall leakage and ca愛從uses analysis
1 brick wall
(1) masonry cracks:
Mortar strength grade is l他鄉ow, the improper use of但新 mortar categories, such a答時s mixed mortar masonry wall with lime 長可mortar masonry or with lax雪習 than the master, to reduc快兒e the intensity街能 of the whole m影車asonry is poor, easy pre人土mature weathering, susong;
In the construction process of morta在制r walls is not dense, not full, 吧物or mistakes and the building m近技ethod of seam and seam, blind seam c湖年racks caused by air;
In the construction o影火f a scaffold, crudely made秒匠, hole wall pipe holes, embedd算但ed in the wall into the 雨明supporting hook at 微年the supports, the k微廠arma is not sealed up risks大裡.
(2) wall surface crack到生:
The mortar plasterin輛離g is too deep, the destruction of 國有the integrity of the foundati分鄉on layer or the construction of the e請腦mbedded wood block improper operatio好件n caused by the uneven thickn草計ess of the bottom or even from the des些分truction of the formation of the hidden也農 damage.
Pointing at the strength of mortar wa西林ll thickness is not e線多nough, not enough, unevendensity;
Do not grasp the 得票different wall m黑用aterial, wood properties, such爸船 as red brick, hollow br這裡ick, fly ash brick, aerated concre工雜te brick water content, construct我報ion essentials, o來廠peration method:
The construction process is not wel文人l controlled, the生低 base treatment is too wet or too dr子美y, the water is insufficient or too muc這就h water will cause the s吧他urface layer off or dry shrink店讀age;
Ceramic mosaic tiles, unglazed tile lo為頻ose, bibulous rate is too large, the 理會mortar is not full, pointing i分南s not tight, the base 體影is not clean, plaste短大r thickness is n些靜ot enough, lack of maintenance和國 caused by cracki大讀ng, peeling off,們議 tile.
(3) structure: st器劇ructure deformati我綠on cracks cause從身d by uneven settlement 短區of foundation, transverse wall sp長商acing is too large, the stress c物的oncentration at the corner wall wit哥腦hout reinforcement, windows and doors銀筆 is too large, the se有體t of joints due to improper and the視藍 masonry wall caused by body strengt著麗h, stiffness and stab化著ility under deformation crack.
(4) cracks caused b弟計y temperature deformation: masonry 吧機parapet, concrete copings, concrete 風笑cornice, concre火湖te roof and top mas空信onry wall body because of the ma術大terial linear expan算匠sion coefficient is not consistent, 也問sunshine time, rang理個e range, after changing the歌懂 winter cool temperature, u視樹neven expansion著作 and contraction c廠拿aused by cracks in h通學orizontal joints又來 or eight joints.煙吧
(5) leakage of building details事西 and joints:
The structural treatment of 和子the drainage slope, th很器e water table, the detailed str熱但ucture of the drip line自樹 or the diversion of rain w術上ater at the sill of輛學 brick wall and concrete wal少人l panel.
The window and 那飛the window frame金紙 gap junction, door and w服飛indow to wall around the 劇煙junction is not filled. The root of老作 the reinforced concrete, the mal通話e waist, the waist hoo雜水p and the masonry wall body. Wall and 厭湖beam, plate making use of mor為黑tar at full beam plate head, head of co錢民ncrete is not tight, precast hollo讀窗w slab end filling head, rain畫妹water from the gaps of pene計歌tration to the wall or ceiling做有.
(6) the natural aging, the mo話事isture-proof material base p哥煙linth, failure caused by reverse os得懂mosis tide.
2 concrete wall
(1) the structure of the joint有書s between precast女上 concrete wall panels 區師and the joints of the 就歌precast concrete wal現得l is unreasonable or the st問藍ructure is waterproof. Such as water 街雜slot, wall at the jo山麗int of the drip物黑 line retaining crisp, destruction of 對科taiwan.
(2) the vertical and horizontal wall, 喝藍cross stitch structure at the cavity is來謝 blocked, damaged lining西森 material, the cavity 冷和lost the decompressi場村on effect, can not司大 cut off the capillary channel 亮鐵caused by slab joints

WeChat public

Contact Us

Contact: manager Jiang
Telephone: 86-755-27780629
Mobile: 13302483273 139木腦23439505
Meizhou office: 13824562059
Address: Guangdon友去g, Shenzhen, Ch訊著ina, all the way to the做討 top of the building 17樂到02, Lida building, room
E-mail:admin@szfsbl.com  szbajhl@163.com


CopyRight © 2017 深圳市亞美地坪裝飾有限公司 All Right Reserved.