High altitude o子科peration procedure
2017-4-6Browse times:3261
In order to implement the nat女道ional safety laws and regulations行樹, standardize the o可們peration of our company, to你能 ensure the safety 快村of the staff and the safety o頻就f the customers, specially set u文綠p the working proc煙在edures:
First, the operating mode
The main use of outdoor hang化白ing board construction oper路看ations.
Two, personnel condition大問s
1, at the age of eighteen to fo樂森rty years of age, have good physic裡機al condition and psychological qu裡報ality. Normal blo水雜od pressure, good eyesight冷吧, no acrophobia.
1, must go through more than three safe到頻ty education and profe飛靜ssional technical train風腦ing qualified.
Three, job prep城讀aration
1, view the work site, determine th黃見e operation plan. 公志Focus on the status of你北 the roof, hanging rope an如明d the safety rope海小 fixed rivet point; and neon l們村ights, billboards and other o坐大bstacles, and determine th你場e operation plan.
2, the weather 問老forecast no strong win車間d, rain and high temperature, field很人 test wind is less th劇熱an 4; the temperature i風車s lower than 35 degrees美從.
3, check the rope and rope hanging pl算美ate work for a detailed inspe快動ction, shall not 雨什be less than 16 mm in diameter, wit匠視hout fracture and kn花美ot.
4, the working position of the gro會訊und to set up a個樂 good fence (fence set standard: Q黃那i drip line outside the 3M) a現校nd the security b開技ulletin board, and by th路腦e safety officer討男 on-site supervision
Four, safety operation procedures
1, the operator must throu兒裡gh physical examination an道好d regular inspection, confirmation wi山黃thout endangering the safety of th紙要e disease before operation.
2, the operator must wea得相r work clothes before 嗎多work, wearing a h中就elmet and gloves, fasten the safety b白海elt and safety loc聽風k installed, otherwise not work.
3, the operator in case of phys物玩ical discomfort or畫話 did not rest well, 鄉要not to participate in high altitude o廠了peration.
4, the operator during work如章 is forbidden to drink and知坐 laugh, not slapstick and throw通海ing items.
5, the conductor must focus on 離廠special command work, shall not be 錯樂used as other work.
6, in the course of the work, bew你有are of big shake; in more than 志亮5 wind above, must immediately sto資從p operation, and the operation 計暗of equipment fixed姐的.
Five, technical points
Hanging plate.
1, hanging in the operation錯土, must choose a s土業afe and reliable riveting 大能points, hanging rope (that is,路還 the main rope) and safety rope (ie, 跳看the rope) can not be fixed要男 at the same point of rive美呢ting. Operation, and by the person i跳朋n charge of the ri書報veting point.
2, the lifting rope and the b友個uilding angular 員話contact site must be adde間人d to protect the rubber rope, 些不rope element.
3, the use of larg員學e rope, hanging board, saf學工ety lock, must be checke生黃d before class, found abnor商鐘mal, stop using. If the舊見 discovery of large rope broke兒報n wire or out of stock than the follow雪謝ing requirements, shou市兒ld immediately stop using;匠謝 in a distance, which has more than 3唱紙 strands of broken wire.
4, hanging plate opera秒市tion with the goods, mu海銀st be bound to prevent falling.
5, the rope in the handling process, p亮了rohibit the use of barbed tool, and p到快revent the sun and rain.制關
6, large rope an河知d hanging plate should be sto姐問red in a dry and ventilated wareho爸放use, is strictly prohibited conta書愛ct with high temperature, o藍明pen flame, strong acid an姐爸d sharp objects.